All current operational stations. If you didn't know, shuttle services coming from Marina Bay (CE2/NS27/TE20) terminate at Stadium (CC6) during off-peak hours, and loop back to Marina Bay. TE16 EW7 CC27
Note: Expo (CG1/DT35) will no longer be a terminus by 2026, as DTL3e will open and the Downtown Line will be extended, with 2 more stations opening: DT36 Xilin DT37/TE31 Sungei Bedok where Sungei Bedok will be the final terminus of the Downtown Line and the Thomson-East Coast Line (until 2040, when the Changi Airport Branch Line may be replaced) MRT Projects Timeline: 2024 - NELe will open, adding NE18 Punggol Coast to the line. ✅ (Opened 10 December 2024) 2024 - TEL4 will open, adding 7 stations to the line, which are: TE23 Tanjong Rhu TE24 Katong Park TE25 Tanjong Katong TE26 Marine Parade TE27 Marine Terrace TE28 Siglap TE29 Bayshore with TE29 Bayshore replacing the current TE22 Gardens by the Bay as the eastern terminus. ✅ [Opened 23 June 2024] ----------------------------------------------------------------------- 2025 - A new station opens on DTL, which is DT4 Hume. ✅ (Opened 28 February 2025) ----------------------------------------------------------------------- 2026 - CCL6 opens, adding 3 new stations to the line, which are: CC30 Keppel CC31 Cantonment CC32 Prince Edward Road These 3 stations will connect CC29/NE1 HarbourFront directly to CE2/NS27/TE20 Marina Bay. 2 stations will also have their station codes updated to: CC33/NS27/TE20 Marina Bay CC34/DT16 Bayfront ✅ (Opened 12 July 2026) 2026 - DTL3e opens, adding 2 stations to the line, which are: DT36 Xilin DT37/TE31 Sungei Bedok with DT37/TE31 Sungei Bedok replacing the current CG1/DT35 Expo as the eastern terminus. 2026 - TEL5 opens, adding 2 new stations to the line: TE30 Bedok South TE31/DT37 Sungei Bedok where TE31/DT37 Sungei Bedok replaces TE29 Bayshore from TEL4 as the terminus of the Thomson-East Coast Line, and connects with the DTL. 2026 - RTS Link between Malaysia and Singapore opens, with the current northern terminus of the TEL (TE1 Woodlands North) being the Singapore terminus of the RTS Link. Bukit Chagar will be the Malaysia terminus. ----------------------------------------------------------------------- 2027 - JRL1 opens. ----------------------------------------------------------------------- 2028 - JRL2 opens. 2028 - 1 new station open on the TEL, which is: TE22A Founders' Memorial ----------------------------------------------------------------------- 2029 - JRL3 opens. ----------------------------------------------------------------------- 2030 - CRL1 opens. CR2 Aviation Park CR3 Loyang CR4 Pasir Ris East CR5/CP1/EW5 Pasir Ris CR6 Tampines North CR7 Defu CR8/NE14 Hougang CR9 Serangoon North CR10 Tavistock CR11/NS16 Ang Mo Kio CR12 Teck Ghee CR13/TE7 Bright Hill ----------------------------------------------------------------------- 2032 - CRL Punggol Extension opens. CP1/CR5/EW1 Pasir Ris CP2 Elias CP3-PE4 Riviera CP4/NE17/PTC Punggol 2032 - CRL2 opens. Future works: TE32/CR1 Changi Airport Terminal 5 TE33 Changi Airport TE34 Expo TE