Construction in novaskovia has skyrocketed as more and more engineers from Antares, Ambronia, and UCS continue arriving to help aid in the recent naval project. Millions of dollars have been pooled into just one of the gigantic rings that will provide storage and barracks. A rather large nuclear reactor has also been implemented into the design to cut off the need for refueling the station frequently. The first ring is estimated to be finished in 4-8 days (1-2 IRL days) as more resources are gathered.
radius of 1 ring= 405 feet length, 406 feet width. Equipped with a motor keeping it spinning (for aesthetics) Contains 6 of the 12 planned docking bays. Weighs roughly 1-2 tons