Antares has successfully made 4 rotary bucket excavators due to a recent deal with Ambronia. The excavators are designed to increase the average build time and costs of the canal with extreme efficiency. Engineering lab 1 was used to build them due to it being the only labs big enough. Eventually the construction was moved to the hangers. Ambronia, only requesting 2, was in for a shock; as the crown prince was more then happy to provide twice as many.
W excavators?