Displacement: 6,800 tonnes (fully loaded) Length: 140m Beam: 20m Draft: 7m Crew: 120 Propulsion: CODAG Maximum Speed: 31 knots Range: 5,500 nautical miles at 15 knots Endurance: 21 days Armament: 1. 127mm Mk 45 Mod 4 advanced naval gun, Advanced Fire Control system, Precision-guided ammunition capability. 2. RAM Block 2 Rolling Airframe Missile, 21 cell launcher 3. 4 Cell NSM naval strike missile launchers, 4x2 launchers, 8 missiles total. 4. 76mm Super Rapid (Reserve Weapon) 5. Torpedo tubes, 2x3 launchers. 6. NARWHAL close-in defence system, decoy launcher. 7. Mine-laying capability
Because we really want to compete against the Japanese navally, and hold our blockade it is time to continue building more frigates. With resources from us, manpower from our allies, and planning/training from Denmark we will be able to build then in 2 years. Because we have so many places working on them, we can build them all simultaneously. My only problem is that 2 weeks from now is when school starts, so it will be annoying to wait that long. We should make time pass twice as fast. Anyways, some will be build around Karachi, meaning it will be impossible for Japan to destroy them, unless they want to get nukes (this would probably be a fine time to use PvP nukes). Others will be built in many different Oceanic ports, with extra Pakistani workers to speed up the process. The last couple will be build in Denmark, if they are willing to do that. If not, we can squeeze them in elsewhere. If Japan attacks them anywhere, that would KO a lot of Danish workers, and bring the whole of DNO into the war. With all our resources, the only restraint should be the time it takes to build them. With our last group of ships nearing ready, our navy will get a major boost. This is increased to 30 if allowed by a manager, or anything in between.