Full name: World Science Incorporated Thermal Research Facility. The pre-meltdown starts at 2000 Cº Guys, we reached the 100 views milestone! :D
@Bright-Flight for the voicelines. Do not steal any sprite, or else if you put it in a project, I'll report it and wait until the Scratch Team deletes your project. Ask for permission, and if I don't give you permission, it's not the end of the world, you can make your own assets. The power outage music was made by me. Development: 4/8/2025 - Original release. 4/17/2025 - Startup complete. 4/19/2025 - Update in the startup. 4/23/2025 - Development of meltdown. 4/24/2025 - Added the alarms to the meltdown. 4/25/2025 - Added beams to the power lasers. 5/11/2025 - Meltdown is almost finished. 5/17/2025 - Changed the status screen logo. 5/18/2025 - [MEGA UPDATE 1] Changed temperatures, added thermal controls, started development on the reactor stall event, added second status screen, made the core collapse in the meltdown, deleted the light next to the startup button, made the startup button cover transparent, added the objective. 5/25/2025 - Finished working on the reactor stall event. 5/28/2025 - Made the control panel text look cooler. 5/30/2025 - Made the status screens show "connection lost" at phase 2 of the meltdown and cleaned up all blocks. 6/20/2025 - Added a main menu and a loading screen, you can now change the volume in the options.